Portfolio · Compliance & Handover

Cross-JV Compliance Dashboard

Unifies contractual obligation status, ISO 19650 digital handover readiness and the shared analytics framework across all four joint ventures. This is the single source of truth for the Head of Asset Management.

Joint ventures
4
Obligations tracked
14,082
Standards in scope
ISO 55001 · 19650 · PAS 55
Portfolio compliance
96.8%
+0.4 MoM
High-severity items
14open
ADL 6 · YJM 5 · MTS 2 · CMET 1
AIM portfolio readiness
72.8% weighted
target 90% by 2027
Shared models in production
9of 14
5 in pilot

Digital handover readiness · ISO 19650

Standardised JHG asset-data transfer

Metro Trains Sydney92% complete
ISO 19650 · Stage 1 baseline complete
Adelaide Trams64% complete
Legacy Bombardier asset records re-keyed
Canberra Metro88% complete
Mitchell depot AIM closeout in progress
Yarra Trams (MR5)47% complete
13,221 obligations being mapped to live evidence

Standards & framework matrix

status per JV

FrameworkMTSADLCMETYJM
ISO 55001 — Asset managementCertifiedIn transitionCertifiedGap analysis
ISO 19650 — BIM information managementAdoptedPartialAdoptedRoadmap Q2 2026
Digital handover specification (JHG)v1.4v1.2v1.4v1.0 baseline
Smart Assurance · obligations enginePilotPilotNot deployedLive

Shared analytics model registry

reusable predictive models across the portfolio

ModelOriginAdoptionRoadmap
HVAC thermo (Adelaide)Production · AdelaidePortable · Yarra fleetPilot ready · MTS
Weibull hazard (Canberra)Production · CanberraPilot · Adelaide bogiesPilot · Yarra wheelsets
PSD door anomaly (MTS)Production · MTSAdaptable · tram doors
Track condition fusion (Yarra)Production · YarraPilot · AdelaideRoadmap · MTS
Obligation→evidence (YJM)Production · YarraPilot rollout · MTSRoadmap · ADL & CMET

Executive recommendations

for the Head of Asset Management

  1. 01Standardise digital handover

    Lock the JHG ISO-19650 specification as a precondition on every future O&M handover. Avoids the slow, manual asset-register rebuild observed during the MR5 transition.

  2. 02Generalise Smart Assurance

    Roll the obligation→evidence engine from Yarra Trams across MTS, Adelaide and Canberra. Yields a single executive compliance pane.

  3. 03Operate a portfolio model registry

    Stand up a central repository for the HVAC, Weibull, PSD anomaly and track-condition models. Reduces duplicated build effort and accelerates payback at each JV.

  4. 04Quantify maintenance-only exposure

    Use the Adelaide thermo + Weibull stack to model contractual cost exposure to 2035 and inform commercial recovery positions.

aligned with David Eyles · Head of Asset Management